What are the Key Steps in Buying House & Land Properties

Typically, the following are the key steps in buying House & Land properties:

(1)  Identify the City / Suburb / Area

Most  house  and  land packages are  available  in the  outer suburbs of the main cities  as part  of  new residential  estates, although there are pockets  closer  to the  CBD that  you can still purchase  a house and land package  within  a redevelopment  of an  existing site. There are   also   vacant   land parcels in   almost every   suburb,   being   the   last remaining  unbuilt land allotments within  established residential areas, often  held by builders  from the  time  the area was a new  estate. These builders may  now decide  its time to release these allotments and offer a house and land package. 

The  choice  of  where  to purchase  would  mostly  depend on how much  you  can  or  want to  invest  and  also  the  reason(s) for purchasing  and  /  or  your financial  goal(s).  Broadly speaking, house and  land packages  can  range  from  as low as $390,000  to $800,000 or even higher.

(2)  Select your House & Land Package

You  can  choose  your  house  and land  as  a  package  or separately. You  could  be purchasing  the land from  the  land owner  and  have your  house  built  by  a  builder OR you  could have  your  house  built by  the  builder  who  is  also  the land owner.  Whichever case  it  is, there  should  be  two  separate contracts  involved:  one  for  the land  purchase and another for the house construction. 

In  a  new  residential  estate  the land  owner  is  usually  the developer, though  you  could be buying  the  land  from  a builder who  booked multiple  choice  lots from  the  developer. In established residential areas, the land owner could be a builder or a private owner. 

(3)  Purchase the Land

If  you  are  buying  the  land separately,  realise  that  the  area and dimensions  of  your  land will determine the house size and design that can fit comfortably. 

Before  purchasing  get  a  copy  of the  Vendor’s  Statement** and Sale Contract,  consult with  a solicitor  on  the  content  of these documents if  necessary, pay  a booking  fee  or full deposit and the balance on settlement day.

**  known  as  Section  32  (Disclosure  Statement)  in  Victoria  and Schedule  1  Prescribed  Documents  in  New South Wales. No legal requirement for a vendor’s statement in Queensland. 

You  should  have  a  very  clear understanding  of  the  size, design and type  of  house  you want  built on  your  land  even before buying the land.  Your  builder  will  have provided you with building plans, an itemised  list  of  inclusions, choice  of finishes,  additions and any customizations for the proposed house.

(4)  Choose Your House Design

You  should  have  a  very  clear understanding  of  the  size, design and type  of  house  you want  built on  your  land  even before buying the land.  Your  builder  will  have provided you with building plans, an itemised  list  of  inclusions, choice  of finishes,  additions and any customizations for the proposed house.

(5)  Soil Test - NOT your worry!

After  paying  a  small  contract preparation  fee  to  your  builder they will  arrange  for  a soil  test to  be  conducted  and produce a site report.  This  key  step ensures  the site  cost so a final Home Building Contract can be finalised. 

(6)  Sign the Building Contract

Once  your  contract  has  been prepared,  arrange  with  your solicitor to  sign  it  (even  if  you are overseas) and pay the balance of your 10% deposit.

(7)  Building Permit - NOT your worry!

Your  builder  will  take  care  of lodging  the  building  permit applications  for  your  property, pay any associated fees, as well as arranging sewer and mains connection deposit.

(8)  Construction - NOT your worry!

Your  builder  is  responsible  for the  construction  of  your  new home and  will  keep  you informed every step of the way. 

(9)  Certificate of Occupancy - NOT your worry!

When  construction  is  complete you  will  be  provided  with  a CoC by your  builder.  This is  the  time to  make  final  payment and  for handover  to  occur,  and  the exciting  part,  you will get to collect your keys (or you can send your proxy).